• Home
  • About Us
  • Search Jobs
  • Submit Resume
  • Articles
  • Testimonials
  • Clients
  • Contact Us
Have you taken our Salary Survey?
  • My Account
  • Saved Jobs
  • My Searches
  • My Badges
  • Logout
Mining recruitment specialists | Mine Jobs
  • About Us
  • Jobs
  • Articles
  • Testimonials
  • Contact Us
Your Career
Find Talent


OR

Submit Resume

Solar Array System under Construction at DeGrussa Mine in WA

By Leslie Zeder
 
615
Views
Tweet

The Sandfire Resources, Western Australia DeGrussa Copper-Gold mine is gearing up for full-production of 1.5 million tonnes expected per year with construction of its $40 million dollar solar array system beginning this month, August. The system is expected to be completed by early next year and once finished will deliver a significant amount of the mine’s power.

Juwi, the German renewable energy heavyweight is building and running the project with funding received from the Federal Government’s Australian Renewable Energy Company and the Clean Energy Finance Corporation to buy power for the next 6 years or more. If Sandfire continue to operate the mine beyond that date then a new agreement may be negotiated.

If everything goes to plan, the DeGrussa mine will become the largest operating mine in Western Australia and the solar array system will be the biggest integrated off-grid solar and battery storage facility in the country. It will consist of 34,080 solar panels spread across 20 hectares.

2 geologists, John Evans and Mary Hawke uncovered gold deposits at site 4 years ago and the mine has progressed lightning fast since their initial discovery.

Sandstone’s Solar Array System Benefits

12,000 tonnes of carbon emissions will be eliminated from the mining operations every single day.

“At same time, it will reduce our carbon footprint, make an important contribution towards achieving improved environmental outcomes and potentially help promote the use of renewable energy in the Australian mining industry,” says Mr Karl Simich, Managing Director of Sandfire.

Sandfire’s current diesel station will save up to 20% of its diesel spend when the solar array system is up and running. It will be joined with the 6MW of short-term battery storage and integrated with the current base load 19MW diesel fired, power station.  

If the mine continues to operate beyond the 6 year projected date then Mr Simich projects the addition of the solar array system will enable Sandfire to realise large savings (after capital costs are repaid throughout the first 6 years).

“There are very few mining projects anywhere in the world today which can lay claim to having moved from discovery drill-hole to first sale in the space of just three years. When the average length of time required to develop new resource projects is now 7-8 years, this is a truly remarkable achievement which has set new benchmarks for the mining industry…,” observes Sandfire’s CEO, Derek La Ferla.

Keep an eye on Mine Jobs for the latest mining related jobs, or follow us to stay up to date with our latest mining blogs.

Follow us on Facebook
Follow us on Twitter

You might also be interested in:

A New Material Handling System Provides Reduced Spillage Solutions for Mining Operations

A New Material Handling System Provides Reduced Spillage Solutions for Mining Operations


A new conveyor belt system under trial at Sibelco QMAG’s processing plant in Rockhampton is so far proving a great success and if all goes well it could be of benefit to other Australian mining operators.

Robots, Drones & Clouds Are the Future of Australian Mining

Robots, Drones & Clouds Are the Future of Australian Mining


Technological and digital advancements in the form of robots, drones and clouds are transforming Australia’s mining operations.

Crowdsourcing A Major Boon When it comes to Mining Data Analysis

Crowdsourcing A Major Boon When it comes to Mining Data Analysis


Crowdsourcing has the potential to cut costs and speed up prospecting and drilling data sifting for mining companies struggling to remain competitive.


Find Mining Jobs Here: http://www.minejobs.com.au/jobs.aspx

Navigate
  • Home
  • Submit Resume
  • News / Blogs
About Us
  • About Us
  • Testimonials
  • Contact Us
Links
    Copyright 2021 PC Recruitment Pty Ltd. All rights reserved.

    Privacy Policy - Cookies